CORRADINI GOMME

descrizione del lavoro

Turnkey of 78 kWp PV plant to reduce 28 tCO2/year. The plant is installed on the roofs of the fuel station in a coplanar mode to the pitches, being integrated into the structure and allows to significantly reduce the energy consumption of the user. The plant is installed as an upgrade to an existing system.
 

Services provided:

  • Final design 
  • Working plan
  • Turnkey
  • Work Supervision
  • Permitting
     

 

 

CORRADINI GOMME