Palmiro Togliatti Tramway

The tender called by Invitalia for the assignment of the design and execution of works for the construction of the Togliatti Tramway was awarded to the temporary grouping of companies comprising Pangea Consorzio Stabile Scarl (agent), Sielte Trasporti S.r.l., Se.ge.co. s.r.l., Dsba s.r.l. (mandatary), Codisab S.r.l., Ciemmegi Appalti S.r.l. (executing consortium), Artelia Italia, Artelia Sas, Erregi S.r.l., Nicola Canepa (indicated designers).
A major 93 million euro investment (PNRR funds) to build the line from Ponte Mammolo (line B) to Subaugusta (line A). An 8 km route, with a total of 19 stops, will pass through the Centocelle junction (line C), also touching the Togliatti stop on the FL2 railway line.
Artelia Italia will provide design services for the road network, logistics, bus stops and terminuses, and the technological network (overhead line, electrical network, traffic light preference, telecommunications network).
The RTP will develop the Executive Design and Artelia will also be involved in Project Management.
The works, whose direction will be entrusted to Rome's transport department, should start in October 2024 and be completed by the end of 2026.
Artelia Italia confirms its position as a leading engineering company with a major success in the mobility sector!