Skip to main content

Hydrogen Refuelling Station (HRS) - Malpensa

Artelia Italia developed the technical and economic feasibility study and obtained permits for the new production and distribution plant, a state-of-the-art facility covering approximately 14,000 square metres.

This project represents a further evolution of the existing Masterplan, demonstrating the joint commitment of Edison and S.E.A. to integrating innovative solutions for reducing emissions and decarbonising airport freight logistics, with a particular focus on sustainable hydrogen mobility. 
At the heart of this complex system, designed and developed by Artelia Italia, is a 1 MW electrolyser capable of producing up to 432 kg of H₂ per day, ensuring a constant supply. The plant includes a multifunctional building with a 44 m² refreshment area and a large technological area for refuelling systems, ensuring maximum efficiency and safety.

 

Edison S.p.A.
2024 - 2025
Malpensa
Technical-Economic Feasibility Study
Permitting
COST OF WORKS

Confidential