H3G Telecom

work description

Artelia’s project assignment began in 2011. Artelia provided the client with turnkey contracting services for the supply and installation of air conditioning systems in new and revamped shops, starting from the pre-feasibility and feasibility stages all the way through to installation.
The programme covered around 200 H3G shops per year all across Italy (50 m² to 100 m² per shop).

 

Services provided

  • General Contractor
  • Design services
  • Permitting
     

 

H3G Telecom